How and where are planning to use this paint? Casual offline and online with friends.
Sim: NASCAR Racing 2003 Season
Mod: NXS20
Car Model: Chevrolet Camaro
Requesting just the BASE? Y/N [No]
Driver Name: Ryan Vargas
Number: 30
Number Font or Link: 3F Racing https://stunodracing.net/index.php?resources/3f-racing-30-font.14897/
Number Color(s): Same as provided on the resource, except the gold outline changed to white
Contig Set Pref: NASCAR Whelen Euro Series
Base Info
NOTE: If this is to be a clone of a real car please post images below the filled out form, NOT Links, images please don't make the painter chase this down for you.
Colors
Primary: White
Secondary: Blue/Black
Wheel Color: Black
Other:
Sponsors
Primary: Critical Path Security
Secondary: Critical Path Security
Images below:
Sim: NASCAR Racing 2003 Season
Mod: NXS20
Car Model: Chevrolet Camaro
Requesting just the BASE? Y/N [No]
Driver Name: Ryan Vargas
Number: 30
Number Font or Link: 3F Racing https://stunodracing.net/index.php?resources/3f-racing-30-font.14897/
Number Color(s): Same as provided on the resource, except the gold outline changed to white
Contig Set Pref: NASCAR Whelen Euro Series
Base Info
NOTE: If this is to be a clone of a real car please post images below the filled out form, NOT Links, images please don't make the painter chase this down for you.
Colors
Primary: White
Secondary: Blue/Black
Wheel Color: Black
Other:
Sponsors
Primary: Critical Path Security
Secondary: Critical Path Security
Images below: